Case name: Sirdaya 1500mw CCGT Independent Power Plant Project
Location: Sirdaya, Uzbekistan
Year: 2021
Products supplied: gate valve/check valve/control pipe/Y- strainer/butterfly valve
Overview
The Sirdaya Power Plant Project is the first gas-fired combined cycle independent power plant project signed in Uzbekistan. It is also the largest thermal power project signed in Uzbekistan in recent years.
Our products were used in the fire protection system of the power plant.
GALA’s fire protection series products are complete cover fire protection gate valves, control pipes, butterfly valves, check valves, strainers, fire hydrants, water flow indicators, and hose copper valves. The entire series has obtained authoritative fire protection FM and UL certifications in the United States and is widely used in automatic fire alarm systems, fire hydrant systems and general water supply network management systems in buildings and large industrial plants.